Electrical Projects

Sl. No. Project Description Client Status
1 Installation of 66/11kV substation Phase 9 Projects
  • AL S'HALAH 132/11 kV SUBSTATION- Energized
  • 132/33kV DUKHAN - 2 SUBSTATION- Energized
  • 132/11kV DUKHAN JUMAILIYA JUNCTION SUBSTATION.- Energized
  • GULF CEMENT COMPANY SWITCHING SUBSTATION 132/11 kV- Energized
  • 132/11kV NORTH ROAD SUBSTATION- Energized.
  • REPLACEMENT OF 132/66/11 KV NAEEJA WEST- Energized
COMPLETED
2 Installation of 132/11KV substation at University South & 220kV GIS at DIS for GTC 371A/2010 Phase-10 Project COMPLETED
3 Installation of 132/66KV & 66/11 KV substation at Ezdan-5 and Gharafa Gulf Mall Energized.Phase-10 Project COMPLETED
4 Installation, Testing & Commissioning of 66/11kV substation for Phase 8 Projects
  • Modification works at 66/11kV New Doha J substation-Energized
  • 66/11kV Substation at Al-Kisah North- Energized.
  • 66/11kV Substation at South West Wakrah-2- Energized 66/11kV Substation at South East Wakrah – EnergizedEnergized
COMPLETED
5 Installation, Testing & Commissioning of 66/11kV substation at DSWMC project for COMPLETED
6 GTC/306/2009 Maintenance, Condition Monitoring & Overhauling Services for Primary S/S of Kahramaa, Doha, Qatar. COMPLETED
7 Testing & Commissioning of 22No.s of LV panels & 12 No.s of 1600kVA transformers at city centre Expansion project Phase-3 for Al-Habthoor Specom. COMPLETED
8 Installation of FOX & TSTU equipments manufactured by ABB Switzerland, for their Phase 7 Projects. COMPLETED
9 Erection works of container substations for Siemens India for their NDIA Projects. COMPLETED
10 Installation of substations for GTC 371/2010 Phase-10 Project.
  • ABU HAMUR SUPER 220/66/11kV SUBSTATION
  • 220/66/11kV LUSAIL DEVELOPMENT SUPER - 3 SUBSTATION.
  • 66/11 kV AIN KHALID NORTH SUBSTATION
  • 66/11kV ISF CAMP SOUTH SUBSTATION
  • 66/11kV ISF CAMP NORTH SUBSTATION
COMPLETED
11 Installation of 11kV cable support structures including laying & terminations of 11kV cables in Boulevard 1 S/S at Lusail. COMPLETED
12 Erection of Substation Electrical Equipment’s-Qatar Power Transmission System Expansion - Phase XI-S1 package.-New Port Super, MPCL & DNS COMPLETED
13 Erection of Substation Electrical Equipment’s-Qatar Power Transmission System Expansion - Phase XI-66/11kV Milahah Logistic Substation COMPLETED
14 Erection of Substation Electrical Equipment’s-Qatar Power Transmission System Expansion - Phase XI-66/11kV RAH-1 Substation COMPLETED
15 To provide Feeder test reports and walk with QEWC EMD on all points of MOM 60 and close out COMPLETED
16 Erection & Pre-Commissioning of 11kV Network modification works COMPLETED
17 33kV Redundancy for including Design, Procurement, Installation, Testing & Commissioning COMPLETED
18 Testing of Cable stability for QP COMPLETED
19 BDV Testing for 6 no.s 500kva Transformer for SGTP Project COMPLETED
20 STG2 AC Hi-Pot Testing for RAF B2 COMPLETED
21 Erection of Substation Electrical Equipment’s-Qatar Power Transmission System Expansion - Phase XI- Grand Hamad Avenue Substation NCC COMPLETED
22 Qatar Umm Al Houl Independent Water & Power Plant Project-GIS Electrical & EHV Cable Laying Works COMPLETED
23 MV Panel installation & Cabling works at UDC (RO Plant) COMPLETED
24 Installation of VFD panels and allied works at Industrial Area Sewage Treatment Plant- ASHGHAL COMPLETED
25 Installation of Transformers & Oil Filtration works for
  • Rawdat Edgim-2 S/s
  • HMC Super
  • RAF-1
COMPLETED
26 Qatar Umm Al Houl Independent Water & Power Plant RO Expansion Project- Transformer Installation, LSP, Electrical & EHV Cable Laying Works. COMPLETED
27 Electrical Installation Works Kahramaa Contract No: GTC / 735E / 2015- Qatar Power Transmission Expansion, Phase 13 - Substation Package S-10
132/11kV Al Zubarah S/S
132/11kV Al Al Wajbah 2 S/S
ONGOING