Mechanical Projects
Sl. No. | Project Description | Company | Status |
---|---|---|---|
1 | Supply Fabricate & Erection of Louvers Support for Substations (Doha Super, Al Baraha Super, Musherib, Doha Industrial Area). | COMPLETED | |
2 | Supply Fabricate & Erection of Main Gate for Substations (Doha Super, Al Baraha Super, Musherib, Doha Industrial Area). | COMPLETED | |
3 | Supply Fabricate & Erection of Main Gates for EZDAN Substations @ Wakrah. | COMPLETED | |
4 | Supply Fabricate & Erect at site Gratings & Steel Supports for Transformer area for EZDAN Substations @ Wakrah. | COMPLETED | |
5 | Supply, Design, Fabricate & Erection of Structural Steel for works for EPIC Gabbro Berth Expansion (Package-1) @ Mesaieed. | COMPLETED | |
6 | Supply and installation of Aluminum louvers and Steel frames for transformer yard Phase 9 Substations. | COMPLETED | |
7 | Modification of Piping System for Performance Heater RAF @ B2 Expansion Project at Ras Abu Funtas power station to GE Qatar. | COMPLETED | |
8 | Supply & Fabrication of Crane Girder for Areva SubstationsPhase VIII. | COMPLETED | |
9 | Supply of FRP platform and ladders for Iberdrola Power Plant | COMPLETED | |
10 | Supply & Fabrication of fire exit walkway for all ABB Substations. | COMPLETED | |
11 | Supply & fixing of structural steel works at west bay. | COMPLETED | |
12 | Fabrication & erection of Sun shades,cable supports, Lightning arrestors to various substations. | COMPLETED | |
13 | Fabrication, Galvanizing, erection of false floor structures, balcony guard rail, steel supports, supply of gratings to various Siemens substations | COMPLETED | |
14 | Supply & installation of gates and cage ladder to various substations | COMPLETED | |
15 | Supply & Fabrication of Steel Grating & Supports for Areva Substations– Phase VIII. | COMPLETED | |
16 | Supply & Fabrication Steel works for EPIC Gabbro Berth Expansion (Package-1) @ Mesaieed –STFA MARINE. | COMPLETED | |
17 | Supply Fabricate & Erection of Crane Girder for L&T Substations – Phase VIII. | COMPLETED | |
18 | Supply & Fabrication of Cable Supports for Mitsubishi Corporation. | COMPLETED | |
19 | Supply & Fabrication of Cable Supports for substations | COMPLETED | |
20 | Supply & Fabrication of Cable Supports for substations | COMPLETED | |
21 | Design , Fabricate & Erect Crane Runway Beam & Monorail for Pumping Station @ Umm Slal | COMPLETED | |
22 | Design, Fabricate & Erect Crane Runway Beam, Louvers, Steel Supports, Main Gate, and Gratings & Gratings Support. @ GGM & Ezdan 5 Substation. | COMPLETED | |
23 | Supply & Fabrication of Cable Supports for substations | Power Projects Qatar |
COMPLETED |
24 | Design, Fabricate & Erect Crane Runway Beam, Louvers, Steel Supports, Main Gate, and Gratings & Gratings Support. Phase9 P.O.D Substation. | COMPLETED | |
25 | Design, Fabricate & Erect Crane Runway Beam, Louvers, Steel Supports, Main Gate, and Gratings & Gratings Support. GTC3188 Substation. | COMPLETED | |
26 | Supply & Fabrication of Cable Supports for substations. | COMPLETED | |
27 | Supply and installation of Aluminum louvers and Steel frames for transformer yard of GTC S2 Package Substations. | COMPLETED | |
28 | Design, Fabricate of Structural Steel Works of Multilevel Car Parking at Onaiza Road. Client | COMPLETED | |
29 | Design, Fabricate of Structural Steel Works in Aspire Logistics Building @ Aspire Zone. | COMPLETED | |
30 | Supply & Install of Transformer Rail for Phase 10 Substations. | COMPLETED | |
31 | Supply & Install of Transformer Rail for QP District primary Substation. | COMPLETED | |
32 | Design, Fabricate & Erect of Crane Runway Beams for QP District primary Substation. | COMPLETED | |
33 | Supply and installation of Aluminum louvers and Steel frames for transformer yard of Package – S8 Substations. | PAT | COMPLETED |
34 | Installation & Testing of SERGI System Plus Supply of Accessories for 12 Power Transformer – Project LUSAIL CP-1 | COMPLETED | |
35 | Installation & Testing of SERGI System Plus Supply of Accessories for 3 Power Transformers – Project Sheraton Park Substation. | COMPLETED | |
36 | Installation & Testing of SERGI System Plus Supply of Accessories for 12 Power Transformer – Project LUSAIL CP-1 | COMPLETED | |
37 | Fabrication & Supply of Steel Structures & Flanges for Pipes. Al Muntazah Street Extension Project. | COMPLETED | |
38 | Design, Fabricate & Erect of Cable Supports. LDS 2 & BOULEVARD 1 Substations. | COMPLETED | |
39 | Design Fabrication, & Steel Structures, Grating & Gratings Supports, Structural Steel Supports & Embedded Steel. Sheraton Park Project | COMPLETED | |
40 | Fabrication, Supply & Install of Gratings, Grating Supports, Structural Steel Supports & Embedded Steel. Dohaland Phase 1C. | COMPLETED | |
41 | Design, Fabricate & Erect Crane Runway Beam, Cable Supports, Main Gate, Gratings & Gratings Supports & SS Handrails. Substations – Phase -XI | COMPLETED | |
42 | Design, Fabricate & Erect of Structural Steel works. Lusail Tower Project - COM 11 | COMPLETED | |
43 | Design, Fabricate of Gratings & Gratings Support, Main Gate. Phase XI kahramaa Substations. | COMPLETED | |
44 | Fabrication, Supply & Erect of Steel Structures & Grating Supports. Al Phase XI kahramaa Substations. | COMPLETED | |
45 | Design, Fabricate & Erect Crane Runway Beam & Monorail Beams. Al Udeid Air Base. | COMPLETED | |
46 | Design, Fabricate & Structural Steels & Gratings. New Port Project. | COMPLETED | |
47 | Design, Fabricate & Erect Crane Runway Beam, Monorail & Structural steel supports. Energy Centre at Doha Festival City Qatar. | COMPLETED | |
48 | Structural Steel work & Aluminum Facede - Rayyan Stadium for FIFA 2022. | COMPLETED | |
49 | Supply and installation of Handrail-Ras Abu Stadium for FIFA 2022 | COMPLETED | |
50 | Steel Works for Lusail Stadium for FIFA 2022 | COMPLETED |